The installation environment of the solar inverter MPPT charging control is critical to the performance and service life of the controller.

The installation environment of the solar inverter MPPT charging control is critical to the performance and service life of the controller. The solar controller needs to be installed in a dry environment and prevent water infiltration. It is best to ensure sufficient ventilation around the controller and sufficient air flow. Never install the controller in a sealed box. The controller can be installed in the same box as the battery, but ensure that there is no gas or liquid leakage from the battery, because these leaks from the battery will corrode and destroy the controller's circuit.


You can choose to connect multiple solar controllers in parallel and install them on the same battery pack to achieve greater charging current. You can also choose to incorporate a new controller when needed in the future to increase the charging current of the system. However, no matter what the circumstances, it must be ensured that the solar cell arrays connected to each controller are independent of each other, that is, it is strictly forbidden to share the same solar cell array between the controllers.


 Warning: There is a risk of damage or explosion of the equipment!


It is strictly forbidden to directly install the controller and the poorly sealed battery in the same environment. The gas leaking from the battery is flammable and corrosive, and will damage the controller's circuit.


Warning: Risk of equipment damage!



If the solar controller is installed in the box, ensure that there is enough ventilation inside and outside the box. A closed environment will cause the temperature of the controller to rise too high and reduce the service life of the controller.


Before installing the solar controller, please read all installation instructions carefully and operate strictly according to the requirements. Any improper operation behavior may cause the current and voltage output by the controller to fail to meet the required requirements. In serious cases, it may even damage the controller, the battery and the load connected to the controller.



Install spare tools:


l Wire stripper


l Wire cutter


l Phillips screwdriver


l Slotted screwdriver


l vise


l Electric drill


l Level


l Hacksaw (for cutting pipes for protecting wire)




日韩电影av二区久久国产| 亚洲一级二级中文字幕| 不卡在线视频一区二区| 日韩欧美亚洲精品成人| 欧美加勒比一区二区三区| av毛片在线免费观看| 久久久久国产精品熟女影院| 国产精品一区二区久久hs| 99久久国产亚洲精品美女| 日本电影三级一区二区三区| 91久久久久人妻精品专区| 中文字幕日本一区二区在线观看| 漫画韩漫画免费在线观看| 国产爽的冒白浆的视频| 97人妻爽人人爽人人| 午夜精品久久久久久99| 国语自产精品视频二区在线| 亚洲成人蜜桃动漫一区| 人妻互换免费中文字幕| 亚洲一级二级中文字幕| 久久久成人国产精品麻豆| 久久久久亚洲av毛片大| 日本伊人久久精品视频| 国产精品视频二区不卡| 日韩欧美亚洲精品成人| 精品国产91乱高清在线观看| 中文人操人人插人免费看视频| 国产精品久久久久久久久久一区| 国产精品欧美大片在线观看| 一区二区日韩av激情| 日韩精品欧美亚洲国产最大| 亚洲欧美都市校园另类| 国产激情作爱在线观看| 99久久国产亚洲精品美女| 97久久人人超碰国产精品| 91精品国自产在线播放| 国产精品一区二区30p| 亚洲国产午夜精品不卡| 国产精品人妻4p一区| 国产真人实拍女处实破| 九九免费观看精品视频|